Rigged down Paul Graham Rig #6 and rental equipment. Returned two loads of drill pipe to NOV (additional trucks not available until Thursday). Released all rental equipment.
Notes/Observations
n/a
Drilling Activity for December 28, 2011
FINAL REPORT
Rigged down Paul Graham Rig #6, loaded equipment, and hauled all loads off location.