Drilling Activity for Wednesday, September 2, 2009 |
Well: APS Cholla Pilot CO2 Well |
Rig: Bearcat Rig 2 |
Activity: Demobilizaiton
|
The remainder of the Bearcat rig and ancillary equipment was demobilized. The tubing head and a dry hole tree were attached to the casing head and the well was secured. Contractor personnel continued cleaning frac tanks of mud solids. Mud and solids were hauled off for disposal. Three pallets containing wellhead equipment and Sandia Technologies' PPE and project binders were hauled to the APS facility for indoor storage. The excess casing (40 joints of 5-1/2" and 3 joints of 9-5/8") were loaded out and dispatched to Houston, TX, for restocking. |
|
Drilling Activity for Thursday, September 3, 2009 |
Well: APS Cholla Pilot CO2 Well |
Rig: Bearcat Rig 2 |
Activity: Demobilization
|
The remaining equipment on site (mud materials, frac tanks, office trailer, and 3-sided cuttings tank) were loaded out and returned to suppliers. All remaining solids in the frac tanks were removed and disposed of at the nearby solid waste disposal facility. The tank cleaning crew was released from service. The trash bin was hauled off to disposal. The mousehole and rathole were covered with pallets, and Sandia Technologies' site supervisor departed the site. |
Drilling Activity Archive |
- July 31, 2009
- August 1-2, 2009
- August 3-4, 2009
- August 5-6, 2009
- August 7-8, 2009
- August 9-10, 2009
- August 11-12, 2009
- August 13-14, 2009
- August 15-16, 2009
- August 17-18, 2009
- August 19-20, 2009
- August 21-22, 2009
- August 23-24, 2009
- August 25-26, 2009
- August 27-28, 2009
- August 29-30, 2009
- August 31-September 1, 2009
|
|
|
|