Drilling Activity for Thursday, August 13, 2009
Well: APS Cholla Pilot CO2 Well
Rig: Bearcat Rig 2
Activity: Install Storm Anchors; Begin Rig Mobilization
Storm anchors for Bearcat Rig No. 2 were set and pull-tested. Bearcat began trucking its rig from Farmington, NM, to the site. Rig mobilization operations were delayed leaving Farmington, NM, and the trucking company elected not to attempt to deliver equipment to the site this day.
Observations  
  • Daily activities summarized to 5:00 p.m. August 13.  
  • Drilling measurements are referenced from the kelly bushing (KB) of Bearcat drilling rig (12 ft above grade level).
  • Surface Casing: 9-5/8" OD, 36 lb/ft Grade J-55 STC; set at 958 ft below the KB.
 
Drilling Activity for Friday, August 14, 2009
Well: APS Cholla Pilot CO2 Well
Rig: Bearcat Rig 2
Activity: Install Storm Anchors; Begin Rig Mobilization
Bearcat equipment began arriving at the site at 6:30 a.m. Bearcat rig personnel were given the site awareness orientation and the Health and Safety Plan was reviewed. Equipment was set down on location but could not be placed into position because the rig’s substructure (first piece of equipment that must be positioned) was delayed at the Arizona Port of Entry due to excessive height. The trucking company dispatched a float with a lower profile to the border and transferred the substructure onto it. The substructure was allowed entry into the state and arrived at the job site at 4:30 p.m. The substructure was positioned over the well and aligned. The ramp to the substructure could not be placed into position because the surface location was uneven. The surface was graded level and the ramp was placed into position. Operations were suspended at 8:00 p.m. due to darkness.
Observations
  • Daily activities summarized to 8:00 p.m. on August 14.
  • Drilling measurements are referenced from the kelly bushing (KB) of Bearcat drilling rig (12 ft above grade level).
  • Surface Casing: 9-5/8" OD, 36 lb/ft Grade J-55 STC; set at 958 ft below the KB.

Drilling Activity Archive


 

art art art art
art art
art Click to view more ino on Moenkopi Formation art art
Click to view more info on Coconino Sandstone art
click to view info on Supai Formation art
click to view info about Naco Formation art
Click to view info about Martin Formation art
art art

click here to review an introduction to geologic formations click for more information about Moenkopi Formation click for more info about Moenkopi Formation click for more info on Supai Formation click for more info on Naco Formation click for more info about Martin Formation

 

| Home | Contact Us | ©2004–2022 Frontier Energy, Inc. All Rights Reserved.|