Drilling Activity for Wednesday, August 19, 2009 |
Well: APS Cholla Pilot CO2 Well |
Rig: Bearcat Rig 2 |
Activity: Drilling in the Supai Formation |
Drilling continued from 1,659 ft to 1,711 ft. A short trip was made to condition the wellbore and the drilling fluid. Drilling continued from 1,711 ft to 1,879 ft. An inclination survey was obtained at 1,835 ft (1 deg) and drilling resumed. Drilling continued from 1,835 ft to 2,140 ft. |
Observations |
|
- Daily activities summarized to 6:00 a.m. August 20.
- Drilling Fluid Properties: Mud weight = 10.1 lb/gal; Plastic viscosity = 6 cp; Yield point = 16 lb/100 ft2; Filter loss = 3.0 cc/30 min.
- Chlorides in drilling mud increased from 125,000 to 160,000 parts per million (ppm) due to drilling of anhydrites, salts.
- Added approximately 700 barrels of water to hole yesterday to account for fluid losses while drilling.
|
|
Drilling Activity for Thursday, August 20, 2009 |
Well: APS Cholla Pilot CO2 Well |
Rig: Bearcat Rig 2 |
Activity: Drilling in the Supai Formation |
Drilling continued from 2,140 ft to 2,352 ft. An inclination survey was obtained at 2,312 ft (1/2 deg). Drilling continued from 2,352 ft to 2,515 ft. |
Observations |
- Daily activities summarized to 6:00 a.m. on August 21.
- Drilling Fluid Properties: Mud weight = 10.1 lb/gal; Plastic viscosity = 5 cp; Yield point = 16 lb/100 ft2; Filter loss = 4.0 cc/30 min.
- Chlorides = 152,000 ppm; Solids = 2.5 %.
|
Drilling Activity Archive |
- July 31, 2009
- August 1-2, 2009
- August 3-4, 2009
- August 5-6, 2009
- August 7-8, 2009
- August 9-10, 2009
- August 11-12, 2009
- August 13-14, 2009
- August 15-16, 2009
- August 17-18, 2009
|
|
|
|